When does support for SAP PI/PO end?
Mainstream maintenance for SAP PI/PO 7.5 ends on December 31, 2027, in line with SAP NetWeaver 7.5. Extended maintenance to the end of 2030 is optional and comes at a premium fee. Older releases are already out of maintenance.
Can I check my SAP PO landscape myself?
Yes. Our free SAP PO readiness scanner reads your Integration Directory export, and your ESR export if you add it, in your browser. In seconds it sorts every integrated configuration into ready to migrate, adjustment required or evaluation required, and shows the main risks and a rough effort range. Nothing is uploaded and no SAP tenant is needed. Send us the result and we’ll turn it into your written snapshot.
Can’t we just use the vendors’ migration tools?
For standard scenarios, yes, and we recommend them: SAP’s migration tool for PO, and Microsoft’s Logic Apps Migration Agent if BizTalk is moving to Azure. Neither SAP nor Microsoft offers a tool that converts BizTalk to SAP Integration Suite, so for that move we use our own scanner, assessment and conversion tooling. SAP’s tool converts many interfaces, including some with Java mappings, but custom adapter modules and BPM processes aren’t migrated and must be redesigned. In BizTalk, complex orchestrations, custom pipeline components and EDI setups need the same specialist work. Those usually carry the most business risk, and the assessment tells you exactly how much of your landscape falls into each group.
Do we have to move everything to the cloud?
No. SAP Integration Suite’s Edge Integration Cell lets you design in the cloud and run integrations inside your own environment, which suits ground-to-ground scenarios and strict data residency needs. The same applies to interfaces moving off BizTalk, and if you choose Azure, Logic Apps’ hybrid deployment model does the same on your own servers. We’ll recommend the right mix in the assessment.
How long does a migration take?
It depends on how many interfaces you have and how much of them is custom. The assessment takes two to four weeks and gives you a realistic, wave-by-wave timeline before you commit to the full project.